Roof
Return to House Page
Roof beams over Great Room.
Roof framing is 2/3rds done.
Truss and roof framing.
V-Match roof going on. This tongue-n-groove is much easier than the floor was :)
V-Match over the Great Room is complete.
V-Match from the outside, with wiring channel.
Master Bedroom Gable
Insulation for the roof
1st Shingles going on (also first window in).
Not really part of the roof, but basement had to be sprayed in order to backfill before starting the roof in the front.
Plywood roof on front of house.
Shingles done.